3 MW Uniconfort boiler refurbishment: grates, refractory and controls

Winno Energy refurbished and relocated an existing 3 MW Uniconfort boiler for a greenhouse in Kauhajoki, Finland. We replaced the grates and refractory lining, renewed the automation, and reviewed the ash handling arrangements.

The boiler had originally produced steam at around 160°C. As part of the project, it was converted to hot-water operation. The refurbished plant is now supplying heat to the greenhouse and has been operating well.

Refurbished 3 MW Uniconfort boiler installed at a greenhouse in Kauhajoki, Finland.
The refurbished 3 MW Uniconfort boiler at its new location in Kauhajoki, Finland.

Grate replacement and refractory repairs

The mechanical refurbishment included replacement of the grates and renewal of the refractory lining in the combustion chamber.

For an owner dealing with damaged grates or worn refractory, the Kauhajoki project is a relevant example: we have carried out these repairs on an Uniconfort boiler as part of a complete plant refurbishment.

New automation and ash handling review

We also renewed the automation and control system and reviewed the ash handling arrangements. The work brought the relocated boiler and its associated equipment together for the new hot-water application.

The project therefore covered the boiler repairs, relocation and conversion, as well as the controls needed for the plant’s new use.

Winno Energy control interface for the refurbished 3 MW Uniconfort boiler in Kauhajoki.
The control interface of the refurbished boiler at the Kauhajoki greenhouse.

Can an existing boiler be refurbished?

The Kauhajoki plant shows one example of an existing boiler being refurbished for a new application. The scope for another plant depends on its condition, the damaged components and the intended operating duty.

We start by reviewing the existing equipment and the problem that needs solving. From there, we can assess the repair scope, identify parts that need replacing and discuss any automation or material-handling changes required.

Does your Uniconfort boiler need repair?

If your boiler has damaged grates, worn refractory or controls that need updating, send us:

  • The boiler model, rated output and a photo of the nameplate.
  • Photos of the damaged areas and a description of the problem.
  • The fuel being used and whether the plant produces hot water or steam.
  • Any available drawings and your required repair timeframe or planned shutdown.

Winno Energy carries out boiler refurbishment, refractory and grate replacement, automation upgrades, and work on fuel and ash handling systems. We also assess repair and upgrade projects involving boilers from other manufacturers.

See our plant upgrades and services or contact Winno Energy to discuss your plant.

Send your boiler details and photos:
energy@winnosolutions.com
Phone / WhatsApp: +358 44 985 9051

About author

Juha Junttila, Winno Energy.

Juha Junttila

Juha is a Managing Director in Winno Energy and has a long history in bioenergy field.

Feel free to connect::
+358 44 985 9051 juha@winnosolutions.com

Industrial biomass heat