A small combined heat and power plant produces electricity and useful heat from one energy input. For a business, the main question is whether both outputs can be used for enough hours each year. Installed electrical capacity alone does not establish a viable project.
Compare heat and electricity demand at the same time
Review hourly or representative seasonal demand profiles. Electricity may be used on site or exported under an agreed arrangement, while recovered heat needs a suitable temperature and a real customer. Heat rejected because there is no demand should not be counted as useful output.
Assess net electricity after the plant’s own consumption, planned maintenance, start-up periods and expected availability. Annual energy production cannot be calculated from nameplate output alone.
Choose the technology around the application
CHP can use different prime movers and fuels. A wood-gas system combines gasification, gas conditioning and an engine-generator. Its fuel and service requirements differ from a combustion boiler or a gas-fired CHP unit. Read how a wood-gas CHP gasifier works for the process steps.
For wood-gas CHP, obtain model-specific limits for moisture, particle size, fines and contaminants. Confirm routine inspection and cleaning, consumable replacement and major overhaul requirements separately. An engine’s overhaul interval is not the same as the interval between routine service visits.
Plan the electrical and heating connections
Grid-parallel operation requires the appropriate connection, protection and commercial arrangements. A CHP unit does not automatically provide power during a grid outage. Island operation and backup capability require a specifically designed and approved system.
Heating connections also need a clear operating strategy: usable temperatures, buffer storage where appropriate, backup heating and what happens when either the heat customer or CHP unit stops.
Build a project-specific business case
Include fuel, electricity imports and exports, useful heat, maintenance, labour, financing and replacement costs. Test lower operating hours and changes in energy prices. The US Department of Energy CHP guide provides a framework for assessing applications and project development.
If the site mainly needs heat, a wood-fuel boiler may be the more relevant option to assess. CHP should be selected for a matching heat and electricity demand, rather than as a default addition to every heating project.